A new heating or cooling system is a big job, and most of the trouble comes from things that were never agreed or never checked. This checklist is written for the person the system belongs to — a homeowner, or a manager looking after a building. Print it out, work through it in order, and tick each item off as it is done. It does not replace the installer's own paperwork. It is a second pair of eyes, so nothing gets missed in the rush of the day.
The list is split into three parts. The first part covers the days before the install, when the important work is done on paper. The second part covers the day itself, when the crew is on site. The third part covers the hour before the crew leaves, when you still have everyone in the room and problems are still easy to fix. If you only have time for one part, do the third — that is the one that catches the most mistakes.
Most installation problems start before the crew arrives, with something that was never agreed in writing. Use this section in the days before the job. Confirm each point with the contractor, and keep the answers with your paperwork. If the quote and the conversation disagree, the written quote is the one that counts, so ask for the quote to be corrected rather than trusting a spoken promise. Make sure you know who is in charge on the day, how to reach them, and what the plan is for the old equipment. A short call to clear these points up now is far easier than a dispute once the old system is already out.
You do not need to watch every step, but a few checks during the day can catch problems while they are still easy to fix. Walk through the work area at natural breaks — when the old unit comes out, when the new one goes in — and ask questions when something looks different from what was agreed. A good crew will explain what they are doing without being asked. If a change is needed, ask for it to be explained before the work goes ahead, and note it down so the final paperwork matches what was actually installed.
Do not let the crew leave until you have walked through the finished job. Test the system, collect the paperwork, and write down anything that still needs attention while everyone is still there. Run the system through a full heating or cooling cycle and check the rooms it serves. Listen for rattles or banging, and ask about any smell that seems wrong. Collect the manuals, the warranty papers, and the service record, and ask the installer to show you how to change the filter and work the thermostat. If anything is unfinished, agree a date for it to be done and get it in writing. For more background on what a normal installation looks like, see the HVAC Installation: What to Expect guide and Air Conditioner Installation: What Homeowners Should Know.